Saturday, 10 November 2012
Wednesday, 31 October 2012
Front brake overhaul
| Tired looking calliper. |
| Dodgy looking bleed nipple. |
| Polish up nice. |
| Looking good. |
| Piston has had it. |
| Finally out |
| Steel Piston needs replacing. |
| Out with the old seal. |
| Clean out the seal grove. |
| New Seal and stainless piston. |
| In with the new seal. |
| Start to push in the new piston. |
| New Bleed nipple. |
| Piston all the way in. |
| Light brush with copper grease. |
| More Copper grease. |
| Looking good. |
Thursday, 18 October 2012
Thursday, 4 October 2012
Seat Pan
| The worst area is on the side of the kick stand. Which suggests that this bike was left out in the wet on the side stand for many years |
| Old base is not to bad. |
| Small 1/8 th plate infill for the rot next to the lock. |
| Mig working great. |
| Clean inside as this will be in view |
| Small rot around drain hole. |
| Foam side after welding. |
| Underside area after welding. |
| Remove old strap nut as it was rotten. |
| Bottom edge front rotten so cut back to good steel. |
| Wind down the required nut. |
| New Steel in place. |
| Mig in place and remove bolt. |
| Weld both sides. |
Subscribe to:
Comments (Atom)